46204_B0 BV-optimized

Certificate number: 46204/B0 BV
File number: ACI4010/030/004
Product code: 5301H
This certificate is not valid when presented without the full attached schedule
composed of 7 sections

TYPE APPROVAL CERTIFICATE
This certificate is issued to
ROXTEC International AB
KARLSKRONA - SWEDEN
for the type of product
PIPE PENETRATIONS IN FIRE DIVISIONS
A-0/A-60 Roxtec sealing system: Sleev-it in steel divisions
(certified products, sleeve position and achieved performance - see §1)

Requirements:

Bureau Veritas Rules for the Classification of Steel Ships Part C Chapter 4

SOLAS 74, as amended, Regulations II-2/9.3.1

IMO Resolution MSC.307(88) (2010 FTP Code)

IMO Resolution MSC.61(67)-(FTP Code) with IMO Resolution MSC.307(88) (2010 FTP Code) article 8

IMO MSC/Circ.1120

This certificate is issued to attest that Bureau Veritas Marine & Offshore did undertake the relevant approval procedures for the product identified
above which was found to comply with the relevant requirements mentioned above.

This certificate will expire on: 07 Feb 2029

For Bureau Veritas Marine & Offshore,

At BV GOTHENBURG, on 07 Feb 2024,

Hans-erik ERICSSON

This certificate was created electronically and is valid without

signature

This certificate remains valid until the date stated above, unless cancelled or revoked, provided the conditions indicated in the subsequent page(s) are complied
with and the product remains satisfactory in service. This certificate will not be valid if the applicant makes any changes or modifications to the approved product,
which have not been notified to, and agreed in writing with Bureau Veritas Marine & Offshore. Should the specified regulations or standards be amended during
the validity of this certificate, the product(s) is/are to be re-approved prior to it/they being placed on board vessels to which the amended regulations or standards
apply. This certificate is issued within the scope of the General Conditions of Bureau Veritas Marine & Offshore available on the internet site www.veristar.com.
Any Person not a party to the contract pursuant to which this document is delivered may not assert a claim against Bureau Veritas Marine & Offshore for any
liability arising out of errors or omissions which may be contained in said document, or for errors of judgement, fault or negligence committed by personnel of the
Society or of its Agents in establishment or issuance of this document, and in connection with any activities for which it may provide.

The electronic version is available at: VeriSTAR Project Management - Bureau Veritas Marine & Offshore

BV Mod. Ad.E 530 June 2017 This certificate consists of 7 page(s)

Certificate number: 46204/B0 BV

THE SCHEDULE OF APPROVAL

1. PRODUCT DESCRIPTION:

Roxtec sealing system: Sleev-it in steel divisions

Consist of a steel collar casing lined with intumescent material on the inside and a flange.
It is available in FC MAR (fire penetration seal) and WT MAR (Fire/Watertight penetration seal) versions depending on

application.

The Sleev-it is installed onto a steel division by welding (FC/WT MAR) or bolting (FC MAR) depending on version.
Marine graded sealant is applied during the installation to achieve a cold smoke seal.

Additional insulation on penetrations and/or pipes:

  • should be approved as having the same level of performance as the penetrated division and expected classification of

penetration,

  • is to be fitted as shown in the referred Manufacturer’s drawings (see §2) and also according to Manufacturer’s insulation

guidelines.

1.1 - A-60 Bulkhead

Pipe material Pipe diameter Sleeve position Insulation drawing
(OD) [mm]
16-225 Exposed S1598000 rev. A dated 31/10/2023 ID 1
ABS 16 Unexposed S1598000 rev. A dated 31/10/2023 ID 5
114 Unexposed S1598000 rev. A dated 31/10/2023 ID 2
Beverage 100 Exposed S1598000 rev. A dated 31/10/2023 ID 1
multipipe 100 Unexposed S1598000 rev. A dated 31/10/2023 ID 2
16-160 Exposed S1598000 rev. A dated 31/10/2023 ID 1
PB 16-225 Exposed S1598000 rev. A dated 31/10/2023 ID 3
16-160 Unexposed S1598000 rev. A dated 31/10/2023 ID 2
16-225 Unexposed S1598000 rev. A dated 31/10/2023 ID 4
16 Exposed S1598000 rev. A dated 31/10/2023 ID 3
PE / HDPE 200-225 Exposed S1598000 rev. A dated 31/10/2023 ID 1
16-225 Unexposed S1598000 rev. A dated 31/10/2023 ID 2
315 Unexposed S1598000 rev. A dated 31/10/2023 ID 9
16 Exposed S1598000 rev. A dated 31/10/2023 ID 1
PE / ALU / PE 16-63 Exposed S1598000 rev. A dated 31/10/2023 ID 7
16-63 Unexposed S1598000 rev. A dated 31/10/2023 ID 8
16 Exposed S1598000 rev. A dated 31/10/2023 ID 3
PP / PPR / PPML 32-200 Exposed S1598000 rev. A dated 31/10/2023 ID 1
/ PPFR 16-110 Unexposed S1598000 rev. A dated 31/10/2023 ID 6
40-200 Unexposed S1598000 rev. A dated 31/10/2023 ID 2
Pre-insulated pipe 75-315 Exposed S1598000 rev. A dated 31/10/2023 ID 7
16-225 Exposed S1598000 rev. A dated 31/10/2023 ID 3
16-322 Exposed S1598000 rev. A dated 31/10/2023 ID 1
PVC 16-200 Unexposed S1598000 rev. A dated 31/10/2023 ID 2
225 Unexposed S1598000 rev. A dated 31/10/2023 ID 4
271-322 Unexposed S1598000 rev. A dated 31/10/2023 ID 5
PVDF 169 Exposed S1598000 rev. A dated 31/10/2023 ID 1
169 Unexposed S1598000 rev. A dated 31/10/2023 ID 2

Following on next page

The electronic version is available at: VeriSTAR Project Management - Bureau Veritas Marine & Offshore

BV Mod. Ad.E 530 June 2017 This certificate consists of 7 page(s)

Certificate number: 46204/B0 BV

1.2 - A-60 Deck

Pipe material Pipe diameter Sleeve position Insulation drawing
(OD) [mm]
16-219 Exposed S1598002 rev. B dated 13/12/2023 ID 1
ABS 225 Exposed S1598002 rev. B dated 13/12/2023 ID 3
16 Unexposed S1598002 rev. B dated 13/12/2023 ID 2
Beverage 100 Exposed S1598002 rev. B dated 13/12/2023 ID 1
multipipe 75-100 Unexposed S1598002 rev. B dated 13/12/2023 ID 2
PB 16-225 Exposed S1598002 rev. B dated 13/12/2023 ID 1
16-225 Unexposed S1598002 rev. B dated 13/12/2023 ID 2
16 Exposed S1598002 rev. B dated 13/12/2023 ID 3
PE / HDPE 16 Unexposed S1598002 rev. B dated 13/12/2023 ID 4
125-225 Unexposed S1598002 rev. B dated 13/12/2023 ID 2
PE / ALU / PE 16-63 Exposed S1598002 rev. B dated 13/12/2023 ID 1
16-63 Unexposed S1598002 rev. B dated 13/12/2023 ID 2
PP / PPR / PPML 16-320 Exposed S1598002 rev. B dated 13/12/2023 ID 1
/ PPFR 16-110 Unexposed S1598002 rev. B dated 13/12/2023 ID 2
Pre-insulated pipe 75-315 Exposed S1598002 rev. B dated 13/12/2023 ID 5
16-225 Exposed S1598002 rev. B dated 13/12/2023 ID 1
PVC 315-321 Exposed S1598002 rev. B dated 13/12/2023 ID 6
16-160 Unexposed S1598002 rev. B dated 13/12/2023 ID 2
271-321 Unexposed S1598002 rev. B dated 13/12/2023 ID 7
PVDF 48-166 Exposed S1598002 rev. B dated 13/12/2023 ID 1
48-166 Unexposed S1598002 rev. B dated 13/12/2023 ID 2

1.3 - A-0 Bulkhead

Pipe material Pipe diameter Sleeve position Insulation drawing
(OD) [mm]
16-225 Exposed S1598001 rev. A dated 31/10/2023 ID 3
ABS 16 Unexposed S1598001 rev. A dated 31/10/2023 ID 7
114 Unexposed S1598001 rev. A dated 31/10/2023 ID 4
Beverage 100 Exposed S1598001 rev. A dated 31/10/2023 ID 3
multipipe 100 Unexposed S1598001 rev. A dated 31/10/2023 ID 4
16-160 Exposed S1598001 rev. A dated 31/10/2023 ID 3
PB 16-225 Exposed S1598001 rev. A dated 31/10/2023 ID 5
16-160 Unexposed S1598001 rev. A dated 31/10/2023 ID 4
16-225 Unexposed S1598001 rev. A dated 31/10/2023 ID 6
16 Exposed S1598001 rev. A dated 31/10/2023 ID 5
PE / HDPE 200-225 Exposed S1598001 rev. A dated 31/10/2023 ID 3
16-225 Unexposed S1598001 rev. A dated 31/10/2023 ID 4
315 Unexposed S1598001 rev. A dated 31/10/2023 ID 10
PE / ALU / PE 16-63 Exposed S1598001 rev. A dated 31/10/2023 ID 1
16-63 Unexposed S1598001 rev. A dated 31/10/2023 ID 2
20-169 Exposed S1598001 rev. A dated 31/10/2023 ID 1
16 Exposed S1598001 rev. A dated 31/10/2023 ID 5
PP / PPR / PPML 32-200 Exposed S1598001 rev. A dated 31/10/2023 ID 3
/ PPFR 20-169 Unexposed S1598001 rev. A dated 31/10/2023 ID 1
16-110 Unexposed S1598001 rev. A dated 31/10/2023 ID 8
40-200 Unexposed S1598001 rev. A dated 31/10/2023 ID 4
Pre-insulated pipe 75-315 Exposed S1598001 rev. A dated 31/10/2023 ID 9

Following on next page

The electronic version is available at: VeriSTAR Project Management - Bureau Veritas Marine & Offshore

BV Mod. Ad.E 530 June 2017 This certificate consists of 7 page(s)

Certificate number: 46204/B0 BV

Pipe material Pipe diameter Sleeve position Insulation drawing
(OD) [mm]
16-160 Exposed S1598001 rev. A dated 31/10/2023 ID 1
16-322 Exposed S1598001 rev. A dated 31/10/2023 ID 3
PVC 16-160 Unexposed S1598001 rev. A dated 31/10/2023 ID 2
16-200 Unexposed S1598001 rev. A dated 31/10/2023 ID 4
225 Unexposed S1598001 rev. A dated 31/10/2023 ID 6
271-322 Unexposed S1598001 rev. A dated 31/10/2023 ID 7
PVDF 169 Exposed S1598001 rev. A dated 31/10/2023 ID 3
169 Unexposed S1598001 rev. A dated 31/10/2023 ID 4

1.4 - A-0 Deck

Pipe material Pipe diameter Sleeve position Insulation drawing
(OD) [mm]
16-219 Exposed S1598003 rev. A dated 31/10/2023 ID 3
ABS 225 Exposed S1598003 rev. A dated 31/10/2023 ID 5
16 Unexposed S1598003 rev. A dated 31/10/2023 ID 4
Beverage 100 Exposed S1598003 rev. A dated 31/10/2023 ID 3
multipipe 75-100 Unexposed S1598003 rev. A dated 31/10/2023 ID 4
PB 16-225 Exposed S1598003 rev. A dated 31/10/2023 ID 3
16-225 Unexposed S1598003 rev. A dated 31/10/2023 ID 4
16 Exposed S1598003 rev. A dated 31/10/2023 ID 5
PE / HDPE 16 Unexposed S1598003 rev. A dated 31/10/2023 ID 6
125-225 Unexposed S1598003 rev. A dated 31/10/2023 ID 4
16-63 Exposed S1598003 rev. A dated 31/10/2023 ID 1
PE / ALU / PE 16-63 Unexposed S1598003 rev. A dated 31/10/2023 ID 4
63 Unexposed S1598003 rev. A dated 31/10/2023 ID 2
PP / PPR / PPML 16-320 Exposed S1598003 rev. A dated 31/10/2023 ID 3
/ PPFR 16-110 Unexposed S1598003 rev. A dated 31/10/2023 ID 4
Pre-insulated pipe 75-315 Exposed S1598003 rev. A dated 31/10/2023 ID 7
16-50 Exposed S1598003 rev. A dated 31/10/2023 ID 1
16-225 Exposed S1598003 rev. A dated 31/10/2023 ID 3
PVC 315-321 Exposed S1598003 rev. A dated 31/10/2023 ID 8
50-63 Unexposed S1598003 rev. A dated 31/10/2023 ID 2
16-160 Unexposed S1598003 rev. A dated 31/10/2023 ID 4
271-321 Unexposed S1598003 rev. A dated 31/10/2023 ID 9
PVDF 48-166 Exposed S1598003 rev. A dated 31/10/2023 ID 3
48-166 Unexposed S1598003 rev. A dated 31/10/2023 ID 4

2. DOCUMENTS AND DRAWINGS:
As per the Manufacturer’s insulation drawings quoted in tables in §1.

Following on next page

The electronic version is available at: VeriSTAR Project Management - Bureau Veritas Marine & Offshore

BV Mod. Ad.E 530 June 2017 This certificate consists of 7 page(s)

Certificate number: 46204/B0 BV

3. TEST REPORTS:

3.1 - A-60 Bulkhead

Test report N° Dated Laboratory
313700 30th January 2012* Exova Warringtonfire, UK
314670 25th June 2012 Exova Warringtonfire, UK
316943 2012* Exova Warringtonfire, UK
327509 10th July 2013 Exova Warringtonfire, UK
177105A 6th January 2009* Bodycote Warringtonfire, UK
180251A 26th May 2009* Bodycote Warringtonfire, UK
183387A 23rd October 2009* Bodycote Warringtonfire, UK
198004A 7th December 2010* Bodycote Warringtonfire, UK
303585A 7th April 2011* Exova Warringtonfire, UK
5P00772 10th December 2015 SP, Sweden
6P10024 7th March 2017 SP, Sweden
7P02024 8th June 2017 SP, Sweden
PGA10870A 13th December 2016 DBI, Denmark
PGB10167A 18th March 2022 DBI, Denmark
PGB10218A 10th July 2023 DBI, Denmark
RS-18/B-264/E 14th September 2018 CTO, Poland
RS-19/B-424/E 27th November 2019 CTO, Poland
RS-21/B-518/E 15th December 2021 CTO, Poland
RS-21/B-241/E 31st June 2021 CTO, Poland
RS-23/B-105/E 23rd May 2023 CTO, Poland
RS-23/B-106/E 23rd May 2023 CTO, Poland
RS-23/B-224/E 2nd October 2023 CTO, Poland
RS-23/B-225/E 30th August 2023 CTO, Poland
RS-23/B-340/E 3rd November 2023 CTO, Poland
PGB10030A 16th July 2020 DBI, Denmark
All tests as per IMO 2010 FTP Code, Annex 1, part 3, except * as per IMO FTP Code, Annex 1, part 3 [test standard: IMO

Resolution A.754(18)].

3.2 - A-60 Deck

Test report N° Dated Laboratory
314669 26th April 2012* Bodycote Warringtonfire, UK
325332 10th July 2013 Bodycote Warringtonfire, UK
334429 13rd August 2013 Bodycote Warringtonfire, UK
170080B 30th April 2008* Bodycote Warringtonfire, UK
175486A 31st October 2008* Bodycote Warringtonfire, UK
190890A_2 26th May 2010* Exova Warringtonfire,
UK
320402A 29th October 2012 Exova Warringtonfire, UK
5P00771 25th November 2015 SP, Sweden
6P02249 17th August 2017 SP, Sweden
6P10022 7th March 2017 SP, Sweden
878/07/A/NP/R 102 28th March 2007* DGA, France
PGA10871A rev 2 16th January 2018 DBI, Denmark
PGA11611A 11th January 2020 DBI, Denmark
PGB10047A 30th November 2020 DBI, Denmark
PGB10172A 17th June 2022 DBI, Denmark
PGB10177A 4th November 2022 DBI, Denmark
RS-18/B-265/E 17th September 2018 CTO, Poland
RS-19/B-356/E 18th October 2019 CTO, Poland
RS-22/B-153/E 4th May 2022 CTO, Poland
RS-22/B-337/E 28th October 2022 CTO, Poland
PGB10032A 1st July 2020 DBI, Denmark
All tests as per IMO 2010 FTP Code, Annex 1, part 3, except * as per IMO FTP Code, Annex 1, part 3 [test standard: IMO

Resolution A.754(18)].

The electronic version is available at: VeriSTAR Project Management - Bureau Veritas Marine & Offshore

BV Mod. Ad.E 530 June 2017 This certificate consists of 7 page(s)

Certificate number: 46204/B0 BV

3.3 - A-0 Bulkhead

Test report N° Dated Laboratory
337717 13rd May 2014 Exova Warringtonfire, UK
198004A 7th December 2010* Exova Warringtonfire, UK
303584A 7th April 2011* Exova Warringtonfire, UK
307171A_2 17th June 2011* Exova Warringtonfire, UK
309855A 23rd December 2011* Exova Warringtonfire, UK
RS-19_B-423E 19th November 2019 CTO, Poland
RS-20/B-081/E 31st March 2020 CTO, Poland
All tests as per IMO 2010 FTP Code, Annex 1, part 3, except * as per IMO FTP Code, Annex 1, part 3 [test standard: IMO

Resolution A.754(18)].

3.4 - A-0 Deck

Test report N° Dated Laboratory
329449 13rd August 2013 Exova Warringtonfire, UK
309638A 20th September 2011* Exova Warringtonfire, UK
320402A 29th October 2012 Exova Warringtonfire, UK
8P07092 rev. 1 16th January 2020 RISE, Sweden
PGA11388A 14th August 2019 DBI, Denmark
PGB10110A 27th April 2021 DBI, Denmark
PGB10169A 18th March 2022 DBI, Denmark
All tests as per IMO 2010 FTP Code, Annex 1, part 3, except * as per IMO FTP Code, Annex 1, part 3 [test standard: IMO

Resolution A.754(18)].

4. APPLICATION / LIMITATION:

4.1 - Approved for use as plastic pipes penetrations:

  • in A-60 class steel divisions, with fire insulation as described in §1,
  • in A-0, A-15, A-30 class steel divisions, with local fire insulation arrangement (on the penetration itself as described in §1

and 200 mm around).

4.2 - The pipe penetration system has only been evaluated with regard to its fire resistance only. For installation in watertight
bulkhead below the bulkhead deck, specific rules may require to subject the pipe penetrations to a prototype test of
watertightness after having undergone the standard fire test for A-class divisions described in IMO 2010 FTP Code Annex 1

Part 3.

5. PRODUCTION SURVEY REQUIREMENTS:

5.1 - The Roxtec sealing system: Sleev-it are to be supplied by ROXTEC International AB in compliance with the type

described in this certificate.

5.2 - This type of product is within the category HBV of Bureau Veritas Rule Note NR320 and as such does not require a BV

product certificate.

5.3 - ROXTEC International AB has to make the necessary arrangements to have its works recognised by Bureau Veritas in

compliance with the requirements of NR320 for HBV products.

5.4 - For information, ROXTEC International AB has declared to Bureau Veritas the following production site(s):
ROXTEC International AB
Rombvägen 2
371 23 KARLSKRONA
SWEDEN

6. MARKING OF PRODUCT:

The product or packing is to be marked with name of manufacturer, type designation and fire technical rating.

7. OTHERS:

7.1 - It is ROXTEC International AB’s responsibility to inform shipbuilders or their sub-contractors of the proper methods of
fitting, use and general maintenance of the approved equipment and the conditions of this approval.

The electronic version is available at: VeriSTAR Project Management - Bureau Veritas Marine & Offshore

BV Mod. Ad.E 530 June 2017 This certificate consists of 7 page(s)

Certificate number: 46204/B0 BV

7.2 - Watertightness and Gastightness:

  • For FC MAR (sizes 16-160) - Survey report N° LDN-08-045 dated 09/05/2008 from DNV:
  • Tested watertightness (before fire exposure) with Marine graded sealant: 1.5 bar during 60 min.
  • Tested gastightness (before fire exposure) with Marine graded sealant: 30 mbar during 30 min.
  • For WT MAR (sizes 16-110) - Survey report N° SOU 0901586/1 dated 08/01/2010 from LR:
  • Tested watertightness (before fire exposure): 3.5 bar during 30 min.
  • Tested gastightness (before fire exposure): 1 bar during 30 min.
    7.3 - This Certificate supersedes the Type Approval Certificate N° 46204/A2 BV issued on 12/04/2021by the Society.

*** END OF CERTIFICATE ***

The electronic version is available at: VeriSTAR Project Management - Bureau Veritas Marine & Offshore

BV Mod. Ad.E 530 June 2017 This certificate consists of 7 page(s)