Attached-to by transit, location and project, the map for your MCT-management

  • Efficient and effective for Transit Designer user, given that the work goes by project, location and transit in order and its belonging to as schedule. For e.g. the package and delivery/ shipped out at request of customer or project going forwards, esp. for the project with large qty. transits, but classified into different location/ area, and varying status under construction.
  • New hand/ user of Transit Designer would become used to it upon this emphasis during training he or she got, in turn work smoothly for each stakeholder of asset we get involved.
  • Designer, worker and inspector in terms of cable transit or pipe penetration, would be on the same page during lifespan of biz.